Show Navigation

Closed Hammersmith Bridge

After being closed indefinitely to all traffic due to structural faults, pedestrians walk across Hammersmith Bridge, on 11th April 2019, in west London, England. Safety checks revealed "critical faults" and Hammersmith and Fulham Council has said it's ben left with no choice but to shut the bridge until refurbishment costs could be met. The government has said that between 2015 and 2021 its is providing £11bn of support to the 132-year-old bridge.

Add to Cart Add to Lightbox Download
Filename
hammersmith_bridge-49-11-04-2019.jpg
Copyright
Richard Baker
Image Size
5315x3543 / 3.2MB
www.photoshelter.com/support/license
https://www.bakerpictures.com/contact
bridge hammersmith bridge crossing thames hammersmith hammersmith and fulham council borough shut closed restricted structure structural safety design architecture victorian historical heritage past history times bygone era public urban capital city uk britain england london west london close-up detail engineering date 1887
Contained in galleries
Hammersmith Bridge
After being closed indefinitely to all traffic due to structural faults, pedestrians walk across Hammersmith Bridge, on 11th April 2019, in west London, England. Safety checks revealed "critical faults" and Hammersmith and Fulham Council has said it's ben left with no choice but to shut the bridge until refurbishment costs could be met. The government has said that between 2015 and 2021 its is providing £11bn of support to the 132-year-old bridge.
Info
  • Facebook
  • Twitter
x

Richard Baker Photography

  • Archive
    • All Galleries
    • Search
    • Cart
    • Lightbox
    • Client Area
  • Portfolio
  • About
  • Contact
  • Instagram
  • Twitter
  • Blog